🚀 What is substrate-revive-node?

substrate-revive-node is a minimal Substrate template powered by pallet-revive, enabling developers to build and test smart contracts on PolkaVM — the core of Polkadot 2.0.

The Power of pallet-revive

FeatureDescription
Execution Enginepallet-revive runs smart contracts compiled for PolkaVM
Ecosystem CompatibilityBuilt for the next wave of dApps on Polkadot
AdvantagesHigh performance, better efficiency, greater versatility
RPC InterfaceIncludes an Ethereum-compatible RPC interface
Developer Tools SupportWorks with familiar tools like Remix and MetaMask or web3 library
Smart Contract SupportDeploy and interact with Solidity smart contracts on Substrate

Why This Matters in the Age of PolkaVM

The introduction of PolkaVM represents a fundamental shift in how logic will be executed on Polkadot. As the designated successor to the current WASM engine, PolkaVM promises greater performance, efficiency, and versatility, forming the core of the JAM architecture.

This is where substrate-revive-node becomes strategically important. Via pallet-revive means developers can:

  • Test new runtime migrations and features repeatedly with newer PolkaVM development.
  • Deploy and test complex Solidity Dapps without the overhead of slow, manual resets.

In short, substrate-revive-node is a perfect sandbox for preparing for the PolkaVM future.

🛠️ Quick Start: Running the Pre-Built Node

This section is for developers who want to quickly run the pre-built substrate-revive-node.

Prerequisites

Ensure your machine is configured for Substrate development:

  • Rust: Install the Rust toolchain.

  • Substrate Environment: Follow the official installation guide to set up all necessary dependencies.

  • Install polkadot-omni-node: This tool allows you to run different parachain and relay-chain nodes in a single executable.

    cargo install --locked polkadot-omni-node@0.5.0
    
  • Install staging-chain-spec-builder: This tool helps generate the chain specification file for your parachain.

    cargo install --locked staging-chain-spec-builder@10.0.0
    
  • Install revive-eth-rpc: This tool provides an Ethereum-compatible JSON-RPC interface to your node.

    cargo install pallet-revive-eth-rpc@0.4.0
    

1. Clone the Repository

git clone [https://github.com/openguild-labs/substrate-revive-node.git](https://github.com/openguild-labs/substrate-revive-node.git)
cd substrate-revive-node

2. Build the Node

Compile the node and launch it in development mode.

cargo build --release

3. Generate the Chain Spec

Use the builder to create chain_spec.json for a local Rococo relay chain.

chain-spec-builder create --relay-chain "rococo-local" --para-id 1000 --runtime \
    target/release/wbuild/parachain-template-runtime/parachain_template_runtime.wasm named-preset development

🔬 Optional: Integrating pallet-revive From Scratch

This section provides a detailed, step-by-step guide for developers who want to integrate pallet-revive into their own parachain project based on the polkadot-sdk-parachain-template.

Note: If you're not integrating pallet-revive from scratch, you can bypass this section and proceed to the "Deploy and Interact with Solidity Smart Contracts" guide.

Step 1: Install Rust

👉 Check the Rust installation instructions for your system.

🛠️ Depending on your OS, you may need additional packages. Pay attention to the Rust compiler output.

Step 2: Fetch Parachain Template Code

git clone [https://github.com/paritytech/polkadot-sdk-parachain-template.git](https://github.com/paritytech/polkadot-sdk-parachain-template.git)
cd polkadot-sdk-parachain-template

Step 3: Build the Project

cargo build --release

Step 4: Add pallet-revive to Cargo.toml

In your runtime/Cargo.toml file, add pallet-revive to the features list for polkadot-sdk.

# In runtime/Cargo.toml
polkadot-sdk = { workspace = true, features = ["...", "pallet-revive"], default-features = false }

Reference: View Commit

Step 5: Configure pallet-revive in the Runtime

In runtime/src/lib.rs, add the pallet to construct_runtime! and implement its Config trait.

1. Add to construct_runtime!

// In runtime/src/lib.rs
construct_runtime! {
    pub enum Runtime {
        ...,
        #[runtime::pallet_index(60)]
        Revive = pallet_revive,
        ...
    }
}

2. Implement the Config trait

// In runtime/src/lib.rs
use frame_support::{
	parameter_types,
	traits::{ConstBool, ConstU32, Nothing},
	weights::constants::WEIGHT_REF_TIME_PER_SECOND,
};
use sp_runtime::Perbill;

// Define necessary constants and parameter types
const ETH: u128 = 1_000_000_000_000_000_000;
pub const fn deposit(items: u32, bytes: u32) -> Balance {
	(items as Balance * UNIT + (bytes as Balance) * (5 * MILLI_UNIT / 100)) / 10
}
parameter_types! {
	pub ChainId: u64 = u32::from(crate::genesis_config_presets::PARACHAIN_ID) as u64;
	pub const DepositPerItem: Balance = deposit(1, 0);
	pub const DepositPerByte: Balance = deposit(0, 1);
	pub const DefaultDepositLimit: Balance = deposit(1024, 1024 * 1024);
	pub const CodeHashLockupDepositPercent: Perbill = Perbill::from_percent(30);
	pub const NativeToEthRatio: u32 = (ETH/UNIT) as u32;
}

// Implement the pallet_revive::Config trait
impl pallet_revive::Config for Runtime {
	type AddressMapper = pallet_revive::AccountId32Mapper<Self>;
	type CallFilter = Nothing;
	type ChainExtension = ();
	type ChainId = ChainId;
	type CodeHashLockupDepositPercent = CodeHashLockupDepositPercent;
	type Currency = Balances;
	type DepositPerByte = DepositPerByte;
	type DepositPerItem = DepositPerItem;
	type InstantiateOrigin = EnsureSigned<Self::AccountId>;
	type NativeToEthRatio = NativeToEthRatio;
	type PVFMemory = ConstU32<{ 512 * 1024 * 1024 }>;
	type RuntimeCall = RuntimeCall;
	type RuntimeEvent = RuntimeEvent;
	type RuntimeHoldReason = RuntimeHoldReason;
	type RuntimeMemory = ConstU32<{ 128 * 1024 * 1024 }>;
	type Time = Timestamp;
	type UnsafeUnstableInterface = ConstBool<false>;
	type UploadOrigin = EnsureSigned<Self::AccountId>;
	type WeightInfo = pallet_revive::weights::SubstrateWeight<Self>;
	type WeightPrice = TransactionPayment;
	type Xcm = ();
	type EthGasEncoder = ();
    type FindAuthor = pallet_authorship::Pallet<Self>;
}

impl TryFrom<RuntimeCall> for pallet_revive::Call<Runtime> {
	type Error = ();
	fn try_from(value: RuntimeCall) -> Result<Self, Self::Error> {
		match value {
			RuntimeCall::Revive(call) => Ok(call),
			_ => Err(()),
		}
	}
}

Reference: View Commit

Step 6: Add Runtime APIs and Extrinsics

You will need to define how Ethereum-style transactions are converted into Substrate extrinsics and implement the necessary runtime APIs for pallet-revive to function. This involves defining UncheckedExtrinsic and implementing the revive_rpc::ReviveRuntimeApi.

  • Reference for Extrinsic conversion: View Commit

  • Reference for Runtime API implementation: View Commit

  • Reference for Fixing Bug due to missing functions/types import : View Commit

Note: Following these modifications, rebuild the project using cargo build --release.

Subsequently, regenerate the chain specification.

chain-spec-builder create --relay-chain "rococo-local" --para-id 1000 --runtime \
    target/release/wbuild/parachain-template-runtime/parachain_template_runtime.wasm named-preset development

🛠️ Deploy and Interact with Solidity Smart Contracts

Once your node is running with pallet-revive, you can deploy Solidity contracts to its EVM environment.

Prerequisites

Install either SubWallet or the Polkadot-JS Extension Wallet to interact with pallet-revive. These browser extensions provide the necessary interface for managing accounts and signing transactions on your Substrate chain.

Step 1: Run Your Node and the ETH RPC

Run your parachain node using polkadot-omni-node and the ETH RPC server in separate terminals.

Terminal 1: Omni Node

polkadot-omni-node --chain chain_spec.json --dev -lruntime::revive=debug --dev-block-time 1000

If your setup is successful, you'll see blocks finalizing, as demonstrated in the screenshot below.

Omni Node

Terminal 2: ETH RPC

eth-rpc --dev

Upon successful execution, the ETH-compatible RPC will be enabled, as illustrated in the screenshot below:

Eth RPC

Note: The provided commands are tailored for macOS. If you are operating on a Windows or Ubuntu system, please adjust the commands accordingly (e.g., use ./eth-rpc --dev for execution).

Step 2: Check the RPC Endpoint

Open another terminal and verify the RPC is working by querying for the latest block.

curl -X POST [http://127.0.0.1:8545](http://127.0.0.1:8545) \
 -H "Content-Type: application/json" \
 -d '{
   "jsonrpc":"2.0",
   "method":"eth_getBlockByNumber",
   "params":["latest", false],
   "id":1
 }'

Result on terminal:

{"jsonrpc":"2.0","id":1,"result":{"baseFeePerGas":"0x3e8","difficulty":"0x0","extraData":"0x","gasLimit":"0xacd7562ed58","gasUsed":"0x0","hash":"0x02cde1577e473247acf571b8f5b897f1260041c97f192ac1b279bfd925c5902d","logsBloom":"0x00000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000000","miner":"0x0000000000000000000000000000000000000000","mixHash":"0x0000000000000000000000000000000000000000000000000000000000000000","nonce":"0x0000000000000000","number":"0x223","parentHash":"0xdff0e158ef27c61596d507fe5db8ebca42093285205f9bd2fad3b2745ecc7851","receiptsRoot":"0x1a87fdedf1adb6675f0bb4b306666b715b45bc1fee8ceafcca3b3b1135e5e0a5","sha3Uncles":"0x0000000000000000000000000000000000000000000000000000000000000000","size":"0x0","stateRoot":"0x80d5f063d8162216863f3fe3b18f6d003126ac4ea33e9869b64782da661a44ef","timestamp":"0x0","transactions":[],"transactionsRoot":"0x1a87fdedf1adb6675f0bb4b306666b715b45bc1fee8ceafcca3b3b1135e5e0a5","uncles":[]}}

Step 3: Add Local Network to MetaMask

Configure MetaMask to connect to your local node.

PropertiesNetwork Details
Network nameSubstrate Node Revive
RPC URLhttp://127.0.0.1:8545
Chain ID1000
Currency SymbolREVIVE

Should you require guidance on configuring a network within MetaMask, please consult the following documentation: https://support.metamask.io/configure/networks/how-to-add-a-custom-network-rpc/

Step 4: Map Substrate Account to ETH Account

Use the revive.mapAccount extrinsic in Polkadot-JS Apps (Developer > Extrinsics) to link your Substrate account (e.g., Alice) to its corresponding Ethereum account. This enables the EVM to recognize your Substrate account's identity.

Map Account

Step 5: Transfer Funds to Your ETH Account

Use the revive.call extrinsic to transfer native REVIVE tokens to your ETH address. This will fund your account for gas fees.

FieldDescriptionExample (if applicable)
destYour MetaMask ETH address0x783FC27915754512E72b5811599504eCa458E4C5
valueAmount of tokens to transfer (in wei)1000000000000000 (1000 REVIVE)
dataHex-encoded data for contract interaction0x (for simple transfers)
Transfer Funds

Check balance on Metamask

Check Balance

Step 6: Deploy Smart Contract with Remix

You can now use an EVM-compatible tool like Remix to deploy your Solidity smart contracts. Connect Remix to your local node (Injected Provider - MetaMask) and deploy as you would on any other EVM network.

Conclusion

The substrate-revive-node is more than a mere template; it's a productivity multiplier for today's Polkadot developer. It directly addresses the needs of builders looking ahead to the PolkaVM and JAM era.

For any developer serious about building on the cutting edge of Polkadot, this tool and the techniques described here are invaluable assets.

Happy hacking!